College & Country Club Roundabout Overall View
College & Country Club Roundabout Impact Fee Ordinance
Detour Map
College & Country Club Roundabout Plans
AHTD Request Letter
ARDOT Traffic Signal Study Response Letter
ARDOT Cost Estimate Response Letter
Categorical Exclusion
These plans are conceptual in nature and have not been adopted by the Conway City Council. There is currently no funding strategy for the construction of this project and no timeframe to begin construction.
The Conway City Council adopted the amendment to the Northeast Old Conway Area Specific Plan contained within the following documents by ordinance on March 10, 2015. The plan and accompanying text replace the corresponding section of the Northeast Old Conway Area Specific Plan.
NOTE: These are large files and may take several minutes to download. Clicking your browser's back button may disrupt the download.
For more information, please contact:
Conway Planning & Development Department
1201 Oak Street
Conway, Arkansas 72032
(501) 450-6105
Markham Street Neighborhood Specific Plan
Markham Street Appendix & Market Study
Markham Street Executive Summary & Action Plan
Garver Engineering's 10% Conceptual Design of Markham Street Redevelopment
Garver Engineering's Revised Pavement Design for Markham Street Redevelopment
Garver Engineering's Revised Hydrology and Hydraulics Report for Markham Street Redevelopment
Markham Street Summary & Responses to Preliminary Design Comments
Markham Street Project Schedule
Jump Start Resolution
Markham Street Jump Start Project Award Letter
As-Bid Plans
Notice to Proceed to Bid
Specifications and Contract Documents
Revised Plans (10-14-19)
Dave Ward Drive ASCT Detector Installation Plans
Agreement of Understanding
Dave Ward Drive Adaptive Signal Control Resolution
I-40/6th Street Overpass Plans
I-40/6th Street Overpass Drainage Plans
6th Street Overpass Resolution
I-40/Oak Street Interchange Improvement Plans
I-40/HWY 64 Traffic Operations Improvements Resolution
Route 65B & 286 Construction Plans for State Highway
Dave Ward Drive I-40 to East German Lane Resolution
MTJ Roundabout Review Tech Memo #2
MTJ Roundabout Review Tech Memo #1
MTJ Roundabout Review Tech Memo #3
2019 Fiscal Year Request for Projects
LID Demonstration Grant
Project Manual
Bid Set
South Interchange (Grading & Structures)
South Interchange (Base & Surface)
Baker-Wills Parkway (Base & Surface)
Baker-Wills Parkway (Grading & Structures)
R920-E Specifications Handout
RRFB Standard Two-Way Road Guide
R920-F Specifications Handout
Two-Pole Median Two-Way Road Guide
Arkansas State Highway Commission Hwy 65 Widening Coordination Letter
Agreement of Understanding
Related Resolution:
Stone Dame Creek Trail Preliminary Plans
Stone Dam Creek Trail HALFF Professional Services Agreement
ARDOT Agreement of Understanding
Stone Dam Creek Trail Review Set
Stone Dam Creek Phase 2 - Agreement of Understanding
Stone Dam Creek Trail Phase 2 - Award Notice
Trail Location Map
RTP Project Application
Final Plans
Chestnut & Van Ronkle Easement
Van Ronkle Box Culvert
Van Ronkle Building Demolition
Chestnut & Van Ronkle Roadway
ARDOT Request Letter
ARDOT Traffic Signal Study Response Letter
Hogan & 64 Traffic Counts Summary
Hogan & 64 Arkansas State Highway Commission Letter
ARDOT Hogan & 64 Roundabout Letter & Preliminary Cost Estimate
Hwy 64 Roundabout Job Response Letter
Related Resolution:
2020-16 Oak Street Adaptive Signal Upgrade
RFQ - Oak Street Coordination
Oak Street Adaptive Signal Upgrade Award Letter
ARDOT Argreement of Understanding
Oak Street Signal Upgrade Resolution
Oak Street Signal Project Schedule
90% Construction Plans
Gatlin Park Bridge Plan
Gatlin Park Bridge Study Summary
Gatlin Park Bridge 90% Plan
Gatlin Park Project Timeline
Harkrider & Bruce Traffic Signal Plans
ARDOT Permit & Agreement
R920-E Specifications Handout
RRFB Standard Two-Way Road Guide
ARDOT Dave Ward Drive between Hwy 365 & I-40 Minutes
Dave Ward Study Resolution
Agreement of Understanding
Dave Ward Vicinity Map
Dave Ward Improvements Public Meeting Comment Form
Travel Demand Report
Final Alternatives
Bid opening on June 10, 2020 at 2 p.m. will be available to view via livestream at https://youtu.be/8CwlNcTo9Mw
Donaghey Ave. Improvement Project Schedule
Traffic Study Report
Concept Design Performance Checks
Preliminary Plans for Donaghey Avenue Improvements
Specifications and Contract Documents
Final Plans
Donaghey Avenue Planholders List
Phase 2 Preliminary Plans
FirstStep Pavement Management Summary
Asphalt Overlay Program Agreement
Tucker Creek Clearing Project Authorization
Tucker Creek Clearing Permit Renewal
Preliminary Engineering Study
Salem Road over Tucker Creek AID Bridge Replacement Cost
Letter of Request from Mayor to ARDOT
AID Narrative
Metroplan STP Grant Application
Metroplan Board Resolution
Official Award Letter
ARDOT Agreement
Salem Rd Bridge Replacement - Preliminary Plans
Connect Conway - Environmental Constraints
Connect Conway - Conceptual Plans
Full BUILD Grant 2020 - Connect Conway
Narrative
Tyler Donaghey Mini Peanut Roundabout Concept
2020 CRISI Grant Submittal
R920-E Specifications Handout
RRFB Standard Two-Way Road Guide
Parks Department - Maintenance Letter
Parks Department - Impact to Centennial Park
Project Location Map
Master Trail Plan
RTP Application Kinley Trail Extension
Conceptual Plans
ARDOT Kinley Trail Extension
Salem and Irby Specifications
Salem and Irby Plans
Fastest Paths
Truck Turn Movements
These plans are conceptual in nature and have not been adopted by the Conway City Council. There is currently no funding strategy for the construction of this project and no timeframe to begin construction.
R920-E Specifications Handout
RRFB Standard Two-Way Road Guide
R920-E Specifications Handout
RRFB Standard Two-Way Road Guide
R920-E Specifications Handout
RRFB Standard Two-Way Road Guide
R920-E Specifications Handout
RRFB Standard Two-Way Road Guide
2019 Street Paving Bid Package
Pavement Marking Plans for 2019 Overlays
State Aid Street 6th College Davis Award Letter
Contract for the Construction of Conway Davis St. Overlay
R920-F Specifications Handout
RRFB Standard Two-Way Road Guide
R920-F Specifications Handout
RRFB Standard Two-Way Road Guide
Scheduled to start construction in 2023
TAP Grant Application
30% Design Review Set
TAP Award Letter
Bid Tabulations
Final 100% Plan Set
Scheduled to start construction in 2023
Van Ronkle Building Demolition
Van Ronkle Box Culvert
Chestnut & Van Ronkle Easement
Metroplan Resolution 20-03
Metroplan Award Letter
Bid Tabulations
Final Construction Drawings
Related Resolution:
Maintenance Commitment Letter
2020 Proposed College Bike Trail
ARDOT Not Selected College Avenue Shared Use Path
Conway College Ave. TAP
Conway Maintenance Letter
Conway College Ave. Bike Trail Map
TAP 2021 Awarded Projects
ARDOT College Ave. Shared Use Path
Bruce & Davis Warrant Analysis
Bruce & Davis Sight Triangles
Resolutions:
Woodland Springs Drainage Analysis
Woodland Springs Engineer's Estimate
Utility relocation underway - Scheduled to start construction
ATP Project Summary Bruce Street 2021
Cost Estimate - 30% College Ave. Shared Use Path
Sewer Pond Road Bridge Plans
Sewer Pond Road Bridge Bid Book
Grant awarded for design.